Mr Lawrence O'Connell from
NSW at the factory using our Builder Assistance Program.
See his progress in this
week by week presentation of pictures.
Page
7
Wait for all thumbnails to
load, then click to enlarge.
|
Week 12 - The final Week |

The
last photos, she's all finished and it fly's very well. The
rotor system was so good the blade tracking did not even need
any adjusting. Smooth as silk.
|
|

Here you see the
Static system with the filters.
|
|
|
|

The
skid pants are a lot of work but ...
|

worth
the effort.
|

|
|
|

Overhead switch panel
all engraved and modified to take duel head set plugs.
|
|
|
|
|

This is a cutter
placed at the end of the blade for tracking.
You can leave it on or take it off while flying it makes no
difference.
It's an easy way to do the tracking without a strobe light.
|
|

Our strobe installed and doubler fitted in the tail boom.
|
|
|
| |

Exhaust
heat shields.
|

Antenna
installed with a doubler.
|
|
|
|
|
|
|
| |
|
|
|
| |
|
|
|
For more finished Builder
Assist Aircraft pictures
Click Here
©
Copyright Rotorway International Australia
Site Designed,
Hosted & Maintained by
RDSWebs